PLC PROJECT - 5

SOFTWARE TESTING


We have test the ladder diagram with the cx-programmer. The program only can simulate in window XP and we simulate and checking the program sequences before move to the PLC memory.


Testing ladder diagram (website picture)


HARDWARE TESTING


The I/O connection is checked before the actual PLC operation is carried out. The model is constructed according to the draft that we have draw.


Initial testing the system


Checking the I/O connecting before actual run


Pneumatic cylinder use for lifting operation


Battery use for motor operate 


Inductive sensor use for detect metal and non-metal sensor


Two cylinders use for sorting operation


Through-beam sensor use for detect the object before lifting operation

Diffuse-reflective sensor use to detect object for next "stamp" operation


Pneumatic value for control cylinder operation


System side view